An oil residue delayed coking unit is being built in Novopolotsk
"NefteZavodMontazh" is a specialized general contracting organization that performs all types of mechanical installation and construction work and is involved in projects in the petrochemical and chemical industries.
The main customer today is "Naftan", with which general contracting agreements have been concluded for 9 new construction projects, the most important of which are the delayed coking unit for solid oil residues and the AT-8 primary oil refining unit. Almost all of OJSC "NefteZavodMontazh"'s resources are concentrated on these projects. And the scope of work is truly impressive. For example, in the reconstruction of AT-8, which will significantly reduce "Naftan"'s energy consumption, over 554 billion non-denominated rubles have already been mastered, 619 units of new equipment have been installed, and almost 3 thousand square meters of territory have been landscaped. The construction of the delayed coking unit has passed the halfway point, with almost 700 billion rubles mastered.
Specialists from "NefteZavodMontazh" also work abroad, in Turkmenistan, at the largest potash salt deposit in Central Asia, the Garlyk deposit, where Belarusians are building a mining and processing plant.
— According to the results of 2015, our enterprise showed positive dynamics, — reported Deputy General Director Konstantin Korolyov. — The profitability of products sold was 12.7%, the volume of work production increased by 26%, and the average salary reached about 10 million rubles. The key to success is high technologies, continuous modernization, on which more than 20 billion rubles are spent annually, and a rather narrow specialization. Today, we are competitive in the market.
working with foreign partners, including according to European standards, we have an accredited welding laboratory. Based on the results of 2015, the joint-stock company was included in the regional Honor Board.Alexander Kutynko, "Vitebskiye Vestі".